beplay官方网站首页
    资讯
    联系我们
    全国服务热线:
    18765894567
    地址:
    济南市市中区经十西路
    邮箱:
    249058066@qq.com
    电话:
    18765894567
    传真:
    18765894567
    新闻资讯 当前位置:首页>beplay官方网站首页>新闻资讯beplay体育苹果手机下载 制作过程中的焊接好方法
    beplay体育苹果手机下载 制作过程中的焊接好方法 来源://www.batheeees.com时间:2020-05-30
      集装箱房屋“火了”,beplay体育苹果手机下载 越来越多,人们对它的认知再也不只是单纯工地使用,逐渐它的应用领域扩大到了商业和服务业。
      Container houses are on fire, and more and more people use containers. People's cognition of it is no longer only for site use, but also for business and service industry.
      beplay体育苹果手机下载 的主体是钢结构的,在制作过程中,会使用到焊接工艺。大家都知道,在焊接中会出现火花,这是很容易产生火灾隐患的。
      The main body of the container is of steel structure, and the welding process will be used in the manufacturing process. As we all know, there will be sparks in welding, which is very easy to produce fire hazards.
    济南市beplay体育苹果手机下载
租赁
      集装箱房屋
      Container house
      焊接式beplay体育苹果手机下载 是目前使用更多的beplay体育苹果手机下载 类型,使用原材料进行制造,在数量上不受限制,而且要比改装式beplay体育苹果手机下载 要便宜很多,可以大规模生产和使用,规格一般是6米长、3米宽,这样的规格更加容易推广使用,可以用在建筑工地上做集体宿舍,里面摆放4-5张上下铺铁床,中间留出一米宽的通道,这样可以更加充分的利用beplay体育苹果手机下载 的空间,也让人们有更加充足的活动空间,可以更加舒适的生活。
      Welded containers are the most commonly used types of containers. They are made of raw materials, unlimited in quantity, and much cheaper than modified containers. They can be produced and used on a large scale. The specifications are generally 6 meters long and 3 meters wide. Such specifications are easier to promote and use. They can be used on construction sites as dormitories 4-5 iron beds are placed on the top and the bottom, and a one meter wide passage is left in the middle, which can make full use of the space of the living container, and also allow people to have more sufficient activity space and more comfortable life.
      集装箱房屋
      Container house
      焊接电弧长度,焊接普通钢时以2~4mm为佳,而焊接不锈钢时以1~3mm为佳,过长则保护效果不好。为防止焊接时出现气孔,焊接部位如有铁锈、油污等务必提前清理干净。
      The length of welding arc is 2-4mm for ordinary steel, 1-3mm for stainless steel, and the protection effect is not good if it is too long. In order to prevent air holes during welding, if there is rust or oil stain on the welding part, it must be cleaned in advance.
      在焊接beplay体育苹果手机下载 房屋时,应采用垂直外特性的电源,直流时采用正极性(焊丝接负极),要确保焊缝成型后具有美观的特点,焊接变形量小的特点。
      When welding the container house, the power source with vertical external characteristics shall be used, and the positive electrode (welding wire connected to the negative electrode) shall be used in the direct current, so as to ensure that the welding seam has the characteristics of beautiful appearance and small welding deformation after forming.
      集装箱房屋 (2)
      Container house (2)
      更好使用纯度为99.99%的氩气作为保护气体,配合集装箱房屋的焊接工作,当焊接电流为50~150A时,氩气流量为8~10L/min,当电流为150~250A时,氩气流量为12~15L/min。
      It is better to use argon with purity of 99.99% as the protective gas to cooperate with the welding work of the container house. When the welding current is 50-150a, the argon flow is 8-10l / min, when the current is 150-250a, the argon flow is 12-15l / min.
    Baidu
    map